Jump to content

Openai/6973e007-1970-8006-b318-cc651da0942a

From freem
Revision as of 05:14, 25 January 2026 by Lukegao (talk | contribs) (by freem.ai...)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)


This conversation was exported from ChatGPT[1]

gpt-5-2[edit | edit source]

User: Do you know when was railroad track Prerov-Breclav electrified?[edit | edit source]

Do you know when was railroad track Prerov-Breclav electrified?

Assistant: Yes, the railroad track between Přerov and Břeclav in the Czech Republic was electrified over a multi-year period in th…[edit | edit source]

Yes, the railroad track between Přerov and Břeclav in the Czech Republic was electrified over a multi-year period in the early 1980s, with electrification works carried out roughly between 1981 and 1985. The line carries both 3 kV DC and 25 kV 50 Hz AC traction systems, with the changeover point near Hulín. cs.wikipedia.org[2]

User: Are you referring to the historical or current position of the changeover point?[edit | edit source]

Are you referring to the historical or current position of the changeover point?

Assistant: Not being some random person online who might remember, here’s what is actually documented about the traction-system ch…[edit | edit source]

Not being some random person online who might remember, here’s what is actually documented about the traction-system changeover point on the Přerov–Břeclav railway:

Electrification work happened in 1981–1985, and the line uses two different electrification systems: 3 kV DC and 25 kV 50 Hz AC. Wikipedia[3]

Current (as of late 2025) position of the changeover point The point where the 3 kV DC system switches to 25 kV AC used to be in Nedakonice. That was the operational arrangement for decades. Wikipedia[4]

However, a recent adjustment moved the contact point northwards out of Nedakonice toward Hulín/Říkovice (technically onto the Hulín side of Říkovice station). The new contact point has been in operation since 15 July 2022. Wikipedia[5]

So to be clear, I’m talking about the actual, current infrastructure setup:

  • Up to mid-2022 the DC/AC boundary was at Nedakonice. Wikipedia[6]
  • Since 15 July 2022 it’s been at the Hulín/Říkovice side of the line (still between Přerov and Břeclav). Wikipedia[7]

That’s not some historical footnote but the present operating situation on the track.

References[edit | edit source]

  1. "Railroad Electrification Timeline". ChatGPT. Retrieved 2026-01-25.
  2. "cs.wikipedia.org". cs.wikipedia.org. Retrieved 2026-01-25.
  3. "Wikipedia". cs.wikipedia.org. Retrieved 2026-01-25.
  4. "Wikipedia". cs.wikipedia.org. Retrieved 2026-01-25.
  5. "Wikipedia". cs.wikipedia.org. Retrieved 2026-01-25.
  6. "Wikipedia". cs.wikipedia.org. Retrieved 2026-01-25.
  7. "Wikipedia". cs.wikipedia.org. Retrieved 2026-01-25.