Jump to content
Main menu
Main menu
move to sidebar
hide
Navigation
Main page
Recent changes
Random page
freem
Search
Search
Appearance
Create account
Log in
Personal tools
Create account
Log in
Pages for logged out editors
learn more
Contributions
Talk
Editing
Openai/68503d6e-9400-800b-a15a-dd25d536e24f
(section)
Add languages
Page
Discussion
English
Read
Edit
Edit source
View history
Tools
Tools
move to sidebar
hide
Actions
Read
Edit
Edit source
View history
General
What links here
Related changes
Special pages
Page information
Appearance
move to sidebar
hide
Warning:
You are not logged in. Your IP address will be publicly visible if you make any edits. If you
log in
or
create an account
, your edits will be attributed to your username, along with other benefits.
Anti-spam check. Do
not
fill this in!
==== π Primary Sources for Planning & Zoning Setbacks over 230β―kV ==== ===== 1. NESC (National Electrical Safety Code) ===== * Published by the IEEE, this sets minimum clearance and safety distances for power lines and structures. * Defines vertical and horizontal clearance from the ground, buildings, and other structures for different voltages. * Not zoning law, but adopted by many states and used to establish technical baselines. : π§© Example: NESC Rule 232 defines minimum clearance of 23β30 feet from conductors to ground depending on voltage and environment. ===== 2. ANSI / IEEE Guidelines ===== * IEEE 738, 1243, 656 and other standards cover thermal, structural, and EMF field evaluations for transmission line design. * Used by utility engineers and often incorporated into utility easement or right-of-way design documents. ===== 3. State-Level PUC Siting Guidelines ===== * For example: - Texas: PUCT uses a routing process (16 Tex. Admin. Code Β§25.101) requiring evaluation of proximity to residences, habitable structures, and environmentally sensitive areas, but does not impose specific setbacks. - Other states like California, Minnesota, and Virginia issue routing handbooks or recommend setback buffers (e.g., 300 ft+ for 500β―kV lines). ===== 4. U.S. EPA & WHO Guidance on EMF ===== * The EPA and World Health Organization (WHO) have issued summaries of EMF research. While they stop short of setting mandatory buffers, some local zoning authorities adopt these to justify 300β500 ft setbacks. ===== 5. County/Local Zoning Codes ===== * Most actual setback rules come from local ordinances, informed by the above. * Example: Some counties prohibit siting >230β―kV lines within 300 feet of homes or schools unless special conditions are met. * These vary widely and often defer to public comment, land use compatibility studies, or environmental impact assessments (EIAs). ===== 6. Case Law & Legal Precedent ===== * Texas courts have upheld that visual blight, EMF concern, and marketability justify compensation or restrictions. * These cases indirectly guide local planners and attorneys in recommending larger setbacks for major lines.
Summary:
Please note that all contributions to freem are considered to be released under the Creative Commons Attribution-ShareAlike 4.0 (see
Freem:Copyrights
for details). If you do not want your writing to be edited mercilessly and redistributed at will, then do not submit it here.
You are also promising us that you wrote this yourself, or copied it from a public domain or similar free resource.
Do not submit copyrighted work without permission!
Cancel
Editing help
(opens in new window)