Jump to content
Main menu
Main menu
move to sidebar
hide
Navigation
Main page
Recent changes
Random page
freem
Search
Search
Appearance
Create account
Log in
Personal tools
Create account
Log in
Pages for logged out editors
learn more
Contributions
Talk
Editing
Openai/695d425b-abc0-800e-b448-ab573ef16184
(section)
Add languages
Page
Discussion
English
Read
Edit
Edit source
View history
Tools
Tools
move to sidebar
hide
Actions
Read
Edit
Edit source
View history
General
What links here
Related changes
Special pages
Page information
Appearance
move to sidebar
hide
Warning:
You are not logged in. Your IP address will be publicly visible if you make any edits. If you
log in
or
create an account
, your edits will be attributed to your username, along with other benefits.
Anti-spam check. Do
not
fill this in!
=== Assistant: Awesome β based on your details Iβll prepare a detailed Bill of Quantities BOQ for your kitchen add-on 2 m Γ 5.4 m withβ¦ === Awesome β based on your details Iβll prepare a detailed Bill of Quantities (BOQ) for your kitchen add-on (2 m Γ 5.4 m) with separate Material & Labor costs optimized for Bocaue, Bulacan conditions. Iβll source real prices where possible (e.g., Wilcon, local supplier ranges) and provide links to products. Before presenting the full BOQ spreadsheet, hereβs a draft summary so you can confirm and tweak before I export it to Excel/CSV/PDF. ==== β PROJECT SUMMARY β KITCHEN ADD-ON (2 m Γ 5.4 m) ==== Gross Floor Area: 10.8 sqm Wall Height: ~2.4β2.7 m Foundation: Slab-on-Grade Walls: CHB + smooth plaster + paint Roof: Lean-to with p. tech corrugated ASA sheets Ceiling: PVC panel Floor: Tile Door: 120 cm aluminum sliding Opening: Adjoining wall stays Plumbing: Sink + faucet, connect to existing water & sewer Electrical: Lights & dedicated circuits Cabinetry: Laminate stone look with upper/lower cabinets + backsplash Ventilation: Range hood Includes: Masonry, electrical, plumbing, carpentry Excludes: Permit costs ==== π§± KEY MATERIALS (with Prices & Links) ==== ===== Countertop & Cabinets ===== * Stone look laminate cabinet & countertop β custom build (material allowance) β Estimated material cost = β±9,000 (Laminate panels + edge banding + hardware allowance β price varies by design) ===== Sink ===== * Primy Radius 25 Undermount Single Bowl β approx. β±6,760 (Good value undermount sink) ===== Faucet ===== * Kitchen faucet best value (Wilcon) β β±880ββ±1,500 range shop.wilcon.com.ph<ref>{{cite web|title=shop.wilcon.com.ph|url=https://shop.wilcon.com.ph/products/plumbing/faucet/kitchen-faucet.html|publisher=shop.wilcon.com.ph|access-date=2026-01-07}}</ref> ===== Range Hood ===== * Hamden 60cm Chimney Type Rangehood β approx. β±6,498 (Entry mid-range rangehood) ===== Tiles ===== * Floor tiles (allowance) β β±7,040 (your provided estimate) ===== Ceiling ===== * PVC panel ceiling β β±4,040 (your provided estimate) ===== Sliding Door ===== * Aluminum sliding door 120 Γ 210 cm β β±11,716 (your provided estimate) ===== Roofing ===== * P.tech corrugated ASA roofing β β±2,150/sheet (1.13 m Γ ~3.7 m coverage) Estimated sheets needed β 5 β β±10,750 ===== Paint ===== * Boysen Permacoat Latex (walls & ceiling) β allowance β±6,000 ==== π οΈ CONSTRUCTION WORKS & LABOR RATES (Provincial) ==== Typical provincial labor unit costs (updated ranges): * Masonry (CHB + plaster) ~ β±25ββ±50/sq.m finish StudyX<ref>{{cite web|title=StudyX|url=https://studyx.ai/questions/4lz4qnp/updated-labor-cost-of-residential-per-scope-of-work-philippines|publisher=studyx.ai|access-date=2026-01-07}}</ref> * Tiling ~ β±80ββ±150/sq.m StudyX<ref>{{cite web|title=StudyX|url=https://studyx.ai/questions/4lz4qnp/updated-labor-cost-of-residential-per-scope-of-work-philippines|publisher=studyx.ai|access-date=2026-01-07}}</ref> * Painting ~ β±25ββ±40/sq.m StudyX<ref>{{cite web|title=StudyX|url=https://studyx.ai/questions/4lz4qnp/updated-labor-cost-of-residential-per-scope-of-work-philippines|publisher=studyx.ai|access-date=2026-01-07}}</ref> * Electrical (fixture/outlet) ~ β±150ββ±250/unit StudyX<ref>{{cite web|title=StudyX|url=https://studyx.ai/questions/4lz4qnp/updated-labor-cost-of-residential-per-scope-of-work-philippines|publisher=studyx.ai|access-date=2026-01-07}}</ref> * Plumbing (fixtures + connections) ~ β±200ββ±350/fixture StudyX<ref>{{cite web|title=StudyX|url=https://studyx.ai/questions/4lz4qnp/updated-labor-cost-of-residential-per-scope-of-work-philippines|publisher=studyx.ai|access-date=2026-01-07}}</ref> * Carpentry / Cabinet install ~ β±7,000ββ±10,000 project labor ==== π DRAFT BOQ β MATERIALS & LABOR SEPARATE ==== | Item | Qty | Unit | MATβL Cost (β±) | LABOR Cost (β±) | Total (β±) | | ----------------------------- | ---- | ---- | -------------- | -------------- | --------- | | Site Prep & Slab | | | | | | | Excavate, compact | 10.8 | sqm | 1,500 | 2,000 | 3,500 | | Slab concrete | 10.8 | sqm | 2,500 | 1,800 | 4,300 | | Walls (CHB + Plaster + Paint) | | | | | | | CHB 4β wall | 27.5 | sqm | 12,000 | 3,000 | 15,000 | | Mortar + Plaster finish | 27.5 | sqm | 3,300 | 2,200 | 5,500 | | Painting (walls) | 27.5 | sqm | 1,500 | 1,100 | 2,600 | | Roofing & Ceiling | | | | | | | Corrugated ASA sheet | 5 | pcs | 10,750 | 2,000 | 12,750 | | Lean-to framing | 10.8 | sqm | 7,000 | 4,500 | 11,500 | | PVC ceiling | 10.8 | sqm | 4,040 | 1,080 | 5,120 | | Flooring | | | | | | | Floor tiles + grout | 10.8 | sqm | 7,040 | 1,350 | 8,390 | | Doors & Openings | | | | | | | Aluminum sliding door | 1 | set | 11,716 | 2,200 | 13,916 | | Kitchen Fixtures | | | | | | | Undermount sink | 1 | pc | 6,760 | 400 | 7,160 | | Faucet | 1 | pc | 1,500 | 350 | 1,850 | | Cabinetry & Countertop | 1 | lot | 9,000 | 10,000 | 19,000 | | Backsplash ceramic | 4 | sqm | 1,800 | 1,200 | 3,000 | | Electrical | | | | | | | Light fixtures (4) | 4 | pcs | 4,000 | 1,000 | 5,000 | | Outlets & dedicated circuits | 4 | pcs | 2,400 | 1,200 | 3,600 | | Range hood | 1 | pc | 6,498 | 800 | 7,298 | | Plumbing | | | | | | | Water lines & drain | 1 | lot | 2,500 | 2,000 | 4,500 | | Misc & Contingency | | | | | | | Misc hardware/tools | | lot | 5,000 | β | 5,000 | | TOTAL | β | β | β±108,004 | β±43,170 | β±151,174 | : Notes: : β’ Material prices are sourced/local allowances and your provided figures (tiling, ceiling, door) plus product sources where available. : shop.wilcon.com.ph : +1 : : β’ Labor reflects typical provincial rates adjusted for Bulacan. : StudyX : : β’ This does not include permit fees (excluded per your request). ==== π QUESTIONS / ADJUSTMENTS BEFORE FINAL EXPORT ==== Before generating the Excel/CSV/PDF BOQ with line items, totals, and subtotals, please confirm: # Should the range hood ducting/exhaust vent to outside be included? # Do you want a gas cooktop provision (gas line installation) or just electric circuits? # Should we include an allowance for electrical panel upgrade / breaker box? # Would you like an itemized cabinetry schedule (upper vs lower counts) or keep it lump sum? # Set contingency % (e.g., 5%, 10%) to buffer for price fluctuations? Reply with your answers and Iβll produce the final BOQ export.
Summary:
Please note that all contributions to freem are considered to be released under the Creative Commons Attribution-ShareAlike 4.0 (see
Freem:Copyrights
for details). If you do not want your writing to be edited mercilessly and redistributed at will, then do not submit it here.
You are also promising us that you wrote this yourself, or copied it from a public domain or similar free resource.
Do not submit copyrighted work without permission!
Cancel
Editing help
(opens in new window)